Page 179 - tmp
P. 179
Too Smooth Entertainment
• The aim of the traffic management plan is to lay out the requirements and
Provisions to be implemented in the process of achieving the most efficient and safe
movement of vehicles on the public highways around the site in conjunction with
the efficient movement of vehicles onto and off the Barley lands farm over the
period of the festival.
• The Traffic Plan details provisions to cater for the additional traffic.
• The Traffic Plan details provisions to cater for the additional traffic over and above
the normal through traffic expected to attend the area of the Festival Site.
• From the build, up to the Festival when the level of Festival related traffic may
affect other traffic on the highways from the Sunday prior to the Festival, through
the main part of the Festival when the site is open to the public until the vast
majority of public attending the event have left the site on the evening of the
Monday.
• The Traffic Plan is a working document reflecting the responses of the traffic
management team to a variety of issues affecting the flow of traffic around the area
of Barley lands farm the Too Smooth Entertainment festival site.
• Whilst this document reflects the planning and agreement to the traffic management
issues that arise between the writing of this document in regards to the planning of
Too Smooth Entertainment festival.
• To date 00/00/2014 there may be issues that arise between the writing of this
document and the implementation of the Too Smooth Entertainment festival traffic
management plans.
• All alterations to the enclosed plans will be made with consultation to those affected
by any changes. Alterations and proposals to the above plan will be put into writing
to blue team management and will be to improve the performance of the general
aims and objectives of the plan itself, that being the safe and efficient movement of
vehicles along the highways around and in the Festival site.
The report is split into the following areas.
The report is split into the following areas
01 The proposed event
02 Traffic levels and expected peaks
03 The Site
04 Vehicle access onto the site and car parks
05 Emergency access onto site
06 Car parking areas and capacities
07 Caravan Camping Fields
08 Drop Off point
28
171