Page 179 - tmp
P. 179

Too Smooth Entertainment


                  •  The aim of the traffic management plan is to lay out the requirements and
                      Provisions to be implemented in the process of achieving the most efficient and safe
                      movement of vehicles on the public highways around the site in conjunction with
                      the efficient movement of vehicles onto and off the Barley lands farm over the
                      period of the festival.


                  •  The Traffic Plan details provisions to cater for the additional traffic.

                  •  The Traffic Plan details provisions to cater for the additional traffic over and above
                      the normal through traffic expected to attend the area of the Festival Site.


                  •  From the build, up to the Festival when the level of Festival related traffic may
                      affect other traffic on the highways from the Sunday prior to the Festival, through
                      the main part of the Festival when the site is open to the public until the vast
                      majority of public attending the event have left the site on the evening of the
                      Monday.

                  •  The Traffic Plan is a working document reflecting the responses of the traffic
                      management team to a variety of issues affecting the flow of traffic around the area
                      of Barley lands farm the Too Smooth Entertainment festival site.

                  •  Whilst this document reflects the planning and agreement to the traffic management
                      issues that arise between the writing of this document in regards to the planning of
                      Too Smooth Entertainment festival.

                  •  To date 00/00/2014 there may be issues that arise between the writing of this
                      document and the implementation of the Too Smooth Entertainment festival traffic
                      management plans.

                  •  All alterations to the enclosed plans will be made with consultation to those affected
                      by any changes. Alterations and proposals to the above plan will be put into writing
                      to blue team management and will be to improve the performance of the general
                      aims and objectives of the plan itself, that being the safe and efficient movement of
                      vehicles along the highways around and in the Festival site.


              The report is split into the following areas.



                                    The report is split into the following areas


            01    The proposed event
            02    Traffic levels and expected peaks
            03    The Site
            04    Vehicle access onto the site and car parks
            05    Emergency access onto site
            06    Car parking areas and capacities
            07    Caravan Camping Fields
            08    Drop Off point

                                                          28
                                                                 171
   174   175   176   177   178   179   180   181   182   183   184